| Project: |
Subway Station / Daimon |
| Location: |
hamamatu-cho, Tokyo |
| Architectural Design: |
Ken Yokogawa Architect Associates Inc. |
| Structural Design: |
TIS & Partners(B2Gate/B4 Gate) |
| Builder: |
Kajima JV. |
| Building Area: |
4,278.52m2 |
| Total Floor Area: |
12,750.31m2 |
| Structural System: |
Reinforced Concrete { Steel Structure(B4 Gate)
Steel Structure(B2Gate) |
| Design Period: |
1991.3-1991.11
1994.7-1995.4 |
| Construction Period: |
1998.12-2000.10 |
|
| Project: |
Subway Station / Shiodome |
| Location: |
Shinbasi, Tokyo |
| Architectural Design: |
Ken Yokogawa Architect Associates Inc. |
| Builder: |
Kajima JV. |
| Building Area: |
6,753.65m2 |
| Total Floor Area: |
9,565.64m2 |
| Design Period: |
1991.3-1991.12
1994.11-1995.8 |
| Construction Period: |
1998.12-2000.10 |
|
 |